Please update your browser.

It looks like you are using an old version of the Microsoft Edge browser. To get the best experience with the Busch website, please update your browser.

PLUS Master Control

Reduced operating costs

Optimization of operating speed and time of each vacuum pump. PLUS Master Control minimizes number of pumps operating and optimizes rotational speed to exact level required by process.

Maintenance planning

Synchronize or de-synchronize vacuum units operating hours to group or split service operations.

Increased uptime

Predictive maintenance through live condition monitoring. Warnings if application requires and anticipates maintenance. Prevention of unplanned downtime through self-adaptability of the system. Prioritizes vacuum units which do not require short-term maintenance.

Accessories

  • Precise vacuum level
  • Week calendar
  • Ecomode
  • Optional inlet valve control
  • Warm-up and cool-down modes
  • Running hours equalization or delay